Design Risk Assessment, Designer Risk Assessment or DRA as it is commonly abbreviated, is a term used for the information provided by the
The term DRA is not mentioned in the
Construction (Design and Management) Regulations 2015 (
Please see section
The above information to be provided by
It is now a well established practice to use Designer Risk Assessments (DRAs) to fulfil the above requirements. However, this information can also be included on drawings etc.
The concept of Risk Assessment (and hence the term Design Risk Assessments - DRA) originates from
Construction Design Safety is the application of various tools, methods and considerations to a particular design to ensure that any construction work carried out as per the design will be as safe as possible on site and that the building or asset once constructed will be safe (during its lifetime) for its use, surrounds and for the general public.
For any construction project, design safety requirements mainly originate from three sources as mentioned in the following picture.
For a construction project, Design Risk Register could be the same name given to a Designer Risk Assessment (DRA) produced by a designer. The Design Risk Register can also be a combined document produced by the CDM Principal Designer to include all design risk-related information (i.e. various DRAs etc.) as received from different designers. A Project Risk Register, on the other hand (unless otherwise stated) could mean a register of all identified project risks including financial, environmental, building regulations, planning etc. in addition to safety. .
Any construction work (i.e., new builds, refurbishment, conversion, demolition etc) creates heath and safety risks to individuals who carry out the work, general public in the vicinity and also for those who occupy and regularly maintain the structure after its completion.
The main purpose of DRA is to inform the relevant project parties (i.e.,
In very simple terms, a DRA should include potential health and safety risks relevant to the design of construction work. The risks included should be those which have not been fully eliminated.
The
When preparing the DRA, the following are the main legal requirements to be considered.
This includes any relevant information about the existing site, for example contamination, existing soil conditions, underground, concealed of overhead services, presence of asbestos, previous use of the site, presence of other premises in the near vicinity etc.
General Principles of Prevention is the term used in the CDM Regulations to describe a need for a systematic way to be used in dealing with potential health and safety risks. This is also known as Hierarchy of Controls and is specified in
Eliminate: aim for complete removal of the risk from the design, for example a risk of coming in contact with overhead electric lines can be eliminated by moving the building footprint sufficiently away from the cables.
Reduce: if a complete removal is not possible or practicable, then try to reduce the level and extent of the potential risk from a significant to a low or manageable risk, for example by providing suitable handrail on a flat roof significantly reduces the risk of fall from height.
Specify: try to specify a less risky option in terms of materials to be used e.g., less hazardous or light in weight etc. In addition, give priority to collective prevention measures instead of individual prevention, e.g., a fixed handrail is preferable compared to individuals being expected to use a harness.
Segregate: aim for a physical separation of hazard from the individuals e.g., designated protected walkways for individuals physically separated from moving machinery, plant or vehicles etc.
Inform: it is very important to provide information about the potential design health and safety risks (except those which have been eliminated) and the measures as mentioned in the above steps (i.e., reduction, specification, segregations) and indeed any other relevant information to those project parties who are required to deal with these risks i.e.
Acronym ERSSI (eliminate, reduce, specify, segregate and inform) can be used to remember the above steps.
More information on the above is also available on HSE website
Work which involves:
It is also a legal requirement as specified in the CDM Regulations for
A DRA should include potential health and safety risks involved in the following stages of construction.
Existing Site Conditions: for example, risk of contamination, adverse soil conditions, underground, concealed or unknow services or overhead (including high voltage) lines, risk of asbestos, previous potentially hazardous use of the site, presence of other premises in near vicinity which may cause potential risks (i.e., school, hospital or care home) etc.
Design: any particular design parameters used, or assumptions made which can introduce potential health and safety risks for example limited designed live loads or assuming that certain existing walls are load bearing and structural etc.
Construction: this should include potential health and safety risks on site when constructing the structure on site as specified in the design and specifications. For example particularly heavy or long structural beams or cladding the first or second floor wall next to the boundary wall with very limited space available.
Post Completion: this should include residual health and safety risks, which would still be present following the completion of site works and which are relevant to use, occupancy and maintenance of the structure. For example, lack of access to certain roofs or glazing or unremoved asbestos etc.
Specific (non-generic): it should be specific to the relevant site issues in priority order and must not include generic and trivial matters.
Prompt: it should be prepared and issued to the project parties in a timely manner, so that they can consider and include the information when preparing CDM documentation e.g., Pre-construction Information (PCI), Construction Phase Plan (CPP) and Health and Safety File.
Precise: it should not be a very long, difficult to read document. A simple, precise and to the point document will have a good chance to be read and acted upon.
Design Risk Assessments (DRA) Example
1. Unforeseeable health and safety risks.
2. Insignificant and trivial health and safety risks.
3. Basic, routine and standard construction health and safety risks that a good competent
4. Exercising any undue site health and safety management function over the
5. Specification of construction methods unless the design is non-standard or requires a particular method or assembly etc.
DRAs are not only method for providing the required information by the
1. Notes on the drawings. Highlighting the issue directly at relevant location on the drawing.
2. Design Risk Registers or CDM Risk Registers.
3. Listing the significant risks and control measures in a report.
4. Providing details as suggested construction method or component assembly sequence when not non-standard or not obvious.
5. Strategy document for post completion fire, cleaning, maintenance, plant replacement and access etc.
6. Residual risk registers for inclusion in Health and Safety File.
A Residual Design Risk Assessment or a Residual Risk Assessment is the identification and assessment of those risks which are not fully eliminated in the design and completion of the site work i.e. which will need to be managed by the Client once the construction project is finally handed over to the Client. It is important for any designer to ensure that any residual design safety risks are fully identified, and assessed and such information is passed on to the CDM Principal Designer for inclusion in the Health and Safety File. The absence of such information can bring up potential issues in maintenance, operations and use of the completed project and therefore the ongoing design liability.
As part of the Design Risk Management pack, we at Safescope have developed '
A blank
We (Safescope) act as
Residual Design Risk Assessment (DRAs) at post completion stage are essential to inform the
However, it is also a fact that there are no good examples or effective CPD training courses available to assist
At Safescope, we offer a bespoke
For further information and a prompt hassle free fee proposal please contact us as follows: